tailwater · trout
South Holston (Tailwater)
Live conditions for South Holston (Tailwater): the gauge, the water temperature, the trend, and what the water is doing today — read the way a guide reads it.
Right now
1,493cfs↗ risingnot now
The gauge's last reading is 4 hours old.
Water temp52.5°F
The water
South Holston (Tailwater) is a tailwater below South Holston Dam in Tennessee, fished for trout — brown, rainbow. On dam-controlled water the generation schedule is the whole story: the wade window is the no-generation block, and rising water at the gauge means the pulse is arriving.
troutbrown troutrainbow trout
Wade and float bands in cfs, the safety notes and the 14-day trend are on the signed-in river page.
Access
- South Holston Dam Tailrace / ADA Fishing Rampramp
- Osceola Island Recreation Area (Weir Dam)walk in
- TVA Riverbend Walk-in Accesswalk in
- Hickory Tree Bridge (Steel Bridge)bridge
- Big Springs Boat Rampramp
- Webb Road Bridgebridge
- Weaver Pike Bridgebridge
Directions to the put-in or wade access ride on every briefing.
Season & regulations
Special regulation: All year In force now
South Holston Dam to Boone, including Boone Reservoir up to the Hwy 11E Bridge on the Watauga arm
“South Fork Holston River South Holston Dam to Boone, including Boone Reservoir upstream to the Hwy 11E Bridge (DeVault/Bristol Hwy. Bridge) on the Watauga arm. 16–22 inch PLR on all trout. Seven (7) trout creel limit, only one (1) trout may be greater than 22 inches.”
Closed to fishing: Nov. 1 – Jan. 31 In force now
Hickory Tree Bridge upstream to the confluence with Bottom Creek
“Closed to all fishing Nov. 1 – Jan. 31 in the following areas: Hickory Tree Bridge upstream to the confluence with Bottom Creek. Downstream point of Boy's Island (first island downstream of Weaver Pike Bridge) upstream to the top of the first island above Webb Road Bridge.”
Closed to fishing: Nov. 1 – Jan. 31 In force now
Downstream point of Boy's Island (first island downstream of Weaver Pike Bridge) upstream to the top of the first island above Webb Road Bridge
“Closed to all fishing Nov. 1 – Jan. 31 in the following areas: Hickory Tree Bridge upstream to the confluence with Bottom Creek. Downstream point of Boy's Island (first island downstream of Weaver Pike Bridge) upstream to the top of the first island above Webb Road Bridge.”
Questions
Is South Holston fishable today?
There is no current reading (the gauge's last reading is 4 hours old), so OUTFISH makes no call on South Holston today.
What's hatching on South Holston in November?
Midges. The full calendar by month is on the signed-in river page.
Where can I access South Holston?
Access on file: South Holston Dam Tailrace / ADA Fishing Ramp (ramp); Osceola Island Recreation Area (Weir Dam) (walk in); TVA Riverbend Walk-in Access (walk in); Hickory Tree Bridge (Steel Bridge) (bridge); Big Springs Boat Ramp (ramp); Webb Road Bridge (bridge); Weaver Pike Bridge (bridge). Directions ride on every briefing.